• SSAW Carbon Steel High Pressure Gas Welded Pipe
  • SSAW Carbon Steel High Pressure Gas Welded Pipe
  • SSAW Carbon Steel High Pressure Gas Welded Pipe

SSAW Carbon Steel High Pressure Gas Welded Pipe

The production capacity of one set of spiral welded pipe equipment is equivalent to 5-8 sets of straight seamless welded pipe equipment. We make multiple pipe equipment lines meet the welding quality requirements and pipe manufacturing grades.

API 5L Standard FBE/3PE Coating SSAW Carbon Steel Spiral Welded Gas Pipe

Type: SSAW Carbon Steel Pipe

Welded Steel Pipe

Outer Diameter: 219mm-3620mm

Wall Thickness: 5mm-26mm

Powder Coating Type: FBE/3PE Coating Carbon Steel Pipe

Application: Water/Gas/Oil Pipeline

High Pressure Carbon Steel Pipe

QC Inspection: Chemical Composition and Mechanical Properties Analysis, Pressure test, Flaw detection, Eddy Current Testing, Hydrostatic Testing or Ultrasonic Examination, Dimension Inspection, etc.

Welded Steel Pipe

Standard

Grade

Chemical Composition(max)%

Mechanical Properties(min)

C

Si

Mn

P

S

Tensile Strength(Mpa)

Yield Strength(Mpa)

API 5L PSL1

A

0.22

-

0.90

0.030

0.030

335

335

B

0.26

-

1.20

0.030

0.030

415

415

X42

0.26

-

1.30

0.030

0.030

415

415

X46

0.26

-

1.40

0.030

0.030

435

435

X52

0.26

-

1.40

0.030

0.030

460

460

X56

0.26

-

1.40

0.030

0.030

490

490

X60

0.26

-

1.40

0.030

0.030

520

520

X65

0.26

-

1.45

0.030

0.030

535

535

X70

0.26

-

1.65

0.030

0.030

570

570

API 5L PSL2

B

0.22

0.45

1.20

0.025

0.015

415

415

X42

0.22

0.45

1.30

0.025

0.015

415

415

X46

0.22

0.45

1.40

0.025

0.015

435

435

X52

0.22

0.45

1.40

0.025

0.015

460

460

X56

0.22

0.45

1.40

0.025

0.015

490

490

X60

0.12

0.45

1.60

0.025

0.015

520

520

X65

0.12

0.45

1.60

0.025

0.015

535

535

X70

0.12

0.45

1.70

0.025

0.015

570

570

X80

0.12

0.45

1.85

0.025

0.015

625

625

ASTM A53

A

0.25

0.10

0.95

0.050

0.045

330

330

B

0.30

0.10

1.20

0.050

0.045

415

415

SSAW Carbon Steel Pipes MOQ: 300-500 Tons

Delivery Time: 15-20 Days

Natural Gas Pipe

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right
SSAW Carbon Steel PipeLSAW Carbon Steel PipeStainless Steel Seamless PipeStainless Steel Welded PipeL245 Welded PipeFlangeTee FittingPipe Fitting Elbow